Routine Inspection–Hydraulic breaker

When the clients receive the hydraulic breaker, please do the Routine Inspection as below:
1. Check that hydraulic oil is clean and that there is an adequate quantity. if dirty, replace the oil, if
insufficiently, add oil.
2. Warm the excavator for about 10 minutes, warm the hydraulic oil, too.
3. Check that hose connections are secure and that nuts and bolts ate fully tightened. Retighten if loose.
4. Grease the hydraulic breaker using a greasing gun.

European Style silenced hydraulic breaker

 

Scroll to Top
Scroll to Top